G702 / G703 Audit Report

Riverside Office Complex — Phase 2

Pay Application #7 · Summit Construction Group · GC Contact: Michael Torres, PM

Contract value: $4,850,000Period ending: May 2, 2026Line items: 14

Total Exposure

$330,830

7 findings · HIGH risk

Risk score82 / 100 — HIGH
LowHigh
1
critical
2
high
3
medium
1
low

Executive Summary

Pay Application #7 from Summit Construction Group contains 7 findings with a combined dollar exposure of $330,830. The most significant issue is a retainage calculation error that has released $40,180 in excess of contractual entitlement. A structural steel overbilling of $75,500 — exceeding the approved change order value — represents the highest-dollar discrepancy. Additionally, $124,000 in stored materials has been billed without the required conditional lien waivers, creating double-payment exposure. Do not certify this pay application until findings F001–F003 are resolved.

Findings — 3 of 7 shown free

F001critical
$40,180

Retainage Release Discrepancy

Scheduled value: $2,450,000. Percent complete certified at 94%. Per contract, retainage should be held at 6% of certified amount = $138,180. Amount withheld on Pay App #7: $98,000. Discrepancy: retainage is under-withheld by $40,180, meaning contractor is receiving $40,180 in excess of contractual entitlement this period.

Recommendation

Request updated Schedule of Values with corrected retainage calculation for line items 01 through 06. Do not certify payment until retainage is reconciled. Review prior pay applications for cumulative retainage shortfall.

F002high
$75,500

Material Overbilling — Structural Steel

Line item 03 (Structural Steel Installation): $387,500 billed to date. Cross-reference against approved change order CO-14 shows revised contract value for this line is $312,000. Cumulative overbilling: $75,500. No supporting documentation provided for the excess billing. Change order CO-14 was signed April 2, 2026.

Recommendation

Request lump-sum breakdown and supporting delivery invoices for line 03. Withhold $75,500 from certification pending documentation. Confirm CO-14 is the most recent approved change to this line item.

F003medium
$124,000

Stored Materials Without Conditional Lien Waiver

Line items 07, 08, and 09 bill $124,000 for materials stored off-site (mechanical equipment, HVAC units). Per AIA G702 guidelines and the project contract §9.3, payment for stored materials requires a conditional lien waiver and proof of insurance for the storage location. Neither was submitted with Pay App #7. Risk: payment creates double-payment exposure — if materials are not subsequently installed, owner has paid for goods without lien protection.

Recommendation

Require conditional lien waiver for all stored materials before certifying payment on lines 07–09. Request certificate of insurance naming the project owner for the off-site storage location.

4 findings locked

See findings on your pay app

Upload your actual G702/G703 for a free preview — then unlock the full report for $299. Manual billing consultants charge $500–$1,500 per review.

Audit your pay application free →

Free preview · Full report $299 · Results in 60 seconds

This is a sample report

See findings on your pay application

Upload your G702/G703. XOPON checks for overbilling, retainage errors, front-loading, and missing lien waivers — in 60 seconds.

Upload yours →